Not your question?
Ask your question
View similar questions
Add your answer here.Check out some similar questions!
Toilet flange slightly canted, not level with finished floor
[ 2 Answers ]
Installed PVC closet flange 1/2 inch above concrete floor, allowing for quickset and ceramic tile installation. Due to the drain pipe pitch, the flange is slightly off-level and canted approximately 1/4" above the finished floor level. Will this be a problem for proper leveling and installation of...
Sump pump Crock Above Finished Basemant Floor
[ 1 Answers ]
:eek: I am having Trouble with a Builder I live in Lorain county and having a new house built and my sump pump crock is 2" to 3” above my basement floor and my builder says this is Ohio code . Also they put in a sealed crock for my furnace A Coil water which must go to my septic tank is...
I wasn't finished
[ 10 Answers ]
18378
Landlord Law - Renting 3rd Floor Finished Attic
[ 2 Answers ]
I would like to finish my 3rd floor attic, and make it liveable space for rental purposes as a 3rd bedroom for the upper unit apartment, with bathroom. As a Landlord, are there codes - laws for areas of exit, etc? What exactly is defined as liveable space? Adam
Moving a toilet over an inch above an already finished floor
[ 1 Answers ]
I am replacing a toilet in my mother in laws house. Her original sewage pipe is cast iron set in a concrete foundtion. I have to move the toilet about 1and a half inches and I need to know how to do this. I was told that there was a way but I need to know how to do it. View more questions Search
|