    screeding a 24x25 slab in one pour
    I am pouring a 24x25 reinforced slab, and I am hoping to do it all in one pour. The only real problem I can see is that screeding will be nearly impossible, without a 25 foot screed board. Is this possible?
    21boat's Avatar
    21boat Posts: 2,441, Reputation: 212
    Ultra Member
     
    #2

    Jul 7, 2009, 11:54 PM

    There are many different ways to do this.

    The first thing to determine is how long of a "screed Board" you want to pull. The average is 8' or 10'. Lets say we are using the 10' sceed board. Cut some 3/8 rebar and use them for height pins inside the forms. Making point to point squares. Measure in on all sides of the forms 9' and keep all squares 9'x9' or less. Hammer the pins in at those points and make sure they are level with the finish height of the floor. This will allow you to "wet bench" a height to pour. To pour, start in a corner and screed out at a 45 degree angle until you run out screed length. Now pour fresh Crete in strip wide enough to screed form pin to pin/ pin to outside form.

    Fill inside that square and treat use the concrete strip as a set form. Once you squared that out pound 3/8 rebar down 2" or more. Repeat this procces as if you are pouring mini pours. You need a light touch, so as not to dig in the wet bench with the screed board.

    Another way, if you have a roof over head and its level pick points and cut a 2by to fit from ceiling to finish floor. This story pole will allow you to Wet Bench whever you want. Cautaion, check ceiling to see if its level. If not use a transit to set shims to adjust for ceiling truss deflction. If its an open ceiling truss scab short 2bys on the side of the truss in the grid pattern to put the story pole up aganist to wet bench below that point.

    If a transit is not avaliable then set inside rebar pins first as stated above. From the top of those set pins measure up to ceiling and cut 2x4 to hit ceiling and top of set pins. Shim where nesscarry on ceiling for story pole. This added set up can save your butt in case a person trips into a pin and knocks it out of wack while pouring. The story pole that was plumbed up from that pin is handy to check the wet bench height.

    On Inside garage pours I use meatal screed rail and wet bench to that. To use this you will need to reinforcement bar/wire in crete because of the screed rail that is 4" high or 6" hing depending on the floor thickness pour. The metal screed rail also acts as a conrol joint for any cracking and if it does it will hairline crack in a nice straight line at the screed rails.

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Moving kitchen sink cut up the slab floor cani pour concrete on top [ 7 Answers ]

I am moving my kitchen sink from one side of the kitchen to the other I located the 3" discharge line which is about 5' from my new sink. I have cut the concrete and i am about put a 3 x 3 x 2 tee and then run my 2" line along and up under the sink to the p trap with a 90. ( I hope this is correct)...

Garage slab on grade pour [ 9 Answers ]

I am planning to build a 24 X 24 garage. I am placing it at the same place as my old, smaller single car garage. I removed the old garage, broke up the old slab into 10 inch chunks. Can I pour the new slab over the old? Do you recommend using 2" styrofoam?What about vapour barrier? Located in...

How to pour concrete over existing patio slab [ 5 Answers ]

We want to expand our kitchen out over an existing patio concrete slab. Approximately 7ft by 14ft. To bring the area level to the house, we will need to pour the new concrete 2 inches deep. How should we prep the area? Our plan is to lay a moisture barrier on top of the new slab and glue...

Leak under carpeted slab by bathroom door - does slab have to be ripped up? [ 2 Answers ]

Could the leak be caused from something else? There is no water on bathroom floor, but could it be the toilet seal? Or a clogged vent backing up water or sewer? Help, we don't have much money and need answers fast.

Concrete Pour [ 2 Answers ]

My mother in law is building a new house and when they poured the foundation they did not have enough concrete to finish so they are coming back in a few days. My concern is first, is this right or should they have pour all in one day and second what guide lines are there in pouring a slab over...


View more questions Search