Ask Experts Questions for FREE Help !
Ask
    toddjax67's Avatar
    toddjax67 Posts: 4, Reputation: 1
    New Member
     
    #1

    Jun 8, 2009, 08:27 AM
    New Bathroom
    I have purchased an old home and doing all renovation myself. Currently 2 baths, but moving one bath too totally new location. I can handle the water supplies no problem. The problem is with the toilet plumbing. The home is built above grade in Florida. The main sewer line is cast iron. Both current toilets are cast iron stacks into the main with the showers also tee'd into those stacks. The new bath will be beyond the end of the last bath on the line. I will not be using the first toilet on the line, but will be converting that bath to a laundry room. How do I add the new bath stack to the main line? Is this way beyond a major DIY'er? I am replumbing all the hot and cold through the home and changing the hot water heater to a whole house tankless.

    Thanks
    Todd
    ballengerb1's Avatar
    ballengerb1 Posts: 27,378, Reputation: 2280
    Home Repair & Remodeling Expert
     
    #2

    Jun 8, 2009, 08:37 AM

    Todd, this project might be close to the limits for many a DIYer. If you are extending the run to a new toilet location you must be sure that you can still maintain the slope/pitch needed to drain properly. For every foot you add to that length you need 1/4" of addiitonl slop. How much furrther will the new toilet be from the old?
    toddjax67's Avatar
    toddjax67 Posts: 4, Reputation: 1
    New Member
     
    #3

    Jun 8, 2009, 10:10 AM

    From the floor down the main is approx 30 inches. Tha bathroom not being used is approx 25 feet away from new location. Would it be helpful, or is it possible to post pics on this sight?
    ballengerb1's Avatar
    ballengerb1 Posts: 27,378, Reputation: 2280
    Home Repair & Remodeling Expert
     
    #4

    Jun 8, 2009, 10:16 AM

    So you will need an additional 6 1/4" of slope. When you say "main" are you talking about the existing drain running away from the old toilet? How much space between that pipe and the underside of the floor joist?
    toddjax67's Avatar
    toddjax67 Posts: 4, Reputation: 1
    New Member
     
    #5

    Jun 8, 2009, 10:39 AM
    Under the home is a approx 6" cast iron pipe going out to sewer connection at street. I am just getting into the plumbing of this home so excuse what I know and don't know. The two baths currently have large cast drops going down from the floor to the main 6" pipe. In those drops is also a 2-3" connection for the shower/tub and the sinks to drain into those drops. I would like to send you a sketch, but can't attach it. email me if it is possible and I will send you the sketch. EMAIL="[email protected]"][email protected][/EMAIL]
    ballengerb1's Avatar
    ballengerb1 Posts: 27,378, Reputation: 2280
    Home Repair & Remodeling Expert
     
    #6

    Jun 8, 2009, 10:45 AM

    Click on my name and you will be given an option for a personal message or e-mail. You can also click on GO ADVANCED below the answer box, then manage files to downlaod a picture or anything from your computer. Tom Speedball1, or Milo, MGD and Mark may have better rough in answers to add.
    toddjax67's Avatar
    toddjax67 Posts: 4, Reputation: 1
    New Member
     
    #7

    Jun 8, 2009, 10:59 AM


    I know it's a rough sketch, but let me know if it helps.
    Attached Images
  1. File Type: pdf sewer connections.pdf (114.2 KB, 178 views)
  2. speedball1's Avatar
    speedball1 Posts: 29,301, Reputation: 1939
    Eternal Plumber
     
    #8

    Jun 8, 2009, 11:11 AM
    Greetings from Sarasota! Sorry Tod, We posted at the same time
    home is built above grade in Florida.
    I assume we're talking crawl space here?
    If you can get the main over to the new location the drainage should go down like this. This configuration only uses one vent for the entire group.
    The toilet will connect to the main. The lavatory to connect to the toilet drain line and vent to the roof. The tub/shower to connect to the lavatory drain line and be wet vented by it as will the toilet. Or the tub/shower will run a dedicated vent and revent back to the stack at least 6" over the lavatrory flood rim. The lavatory will arm off the stack. Be advised to always check local codes before changing or remodeling your drainage system.

    To Send Attachments and pictures
    Make your post and scroll down to Manage Attachments click on that and then click Browse This will allow you to get into your computer and retrieve your picture and upload it to The Plumbing Page

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Bathroom tap [ 1 Answers ]

Hi, my bathroom tap has recently decided not to give out any more cold water, I can turn it on full and there is nothing,this is a hot and cold tap coming out of the same spout , could it be the washer? If so how do I replace?

Bathroom plumbing with basement bathroom [ 1 Answers ]

Could you please tell me what cause my upstairs bathroom to back up into my basement bathroom?

Another Bathroom is needed... The boys are fighting to use the bathroom [ 7 Answers ]

First, thank you for having this kind of forum. Now also let me say that I'm not well versed in the plumbing lingo so hopefully you will be patient with my questions. I live in a 3 levels home (Basement, Main, Upstairs) with the existing bathroom is on the main floor. I'm planing to add...


View more questions Search