Ask Experts Questions for FREE Help !
Ask
    brisonny's Avatar
    brisonny Posts: 1, Reputation: 1
    New Member
     
    #1

    Dec 30, 2004, 09:13 AM
    New tub drain
    I am replacing a standard 5 foot tub on a cement slab. I have read conflicting instructions in regards to when to install the drain. I have access to the back of the tub through a panel in the wall. Do I install the drain before or after I place the tub in its location? Also the new drain is PVC and the trap is copper, can I easily connect these, or is it best to use a copper drain? The old drain has a short copper pipe (tailpeice?) that screwed onto the 'T' section of the drain and was connected to the trap. I plan to reuse or replace this section. And lastly, when I removed the old tub, the old drain surprisingly pulled right out of the trap. Shouldn't this have been secured in with sodder or is it OK for it to simply sit into the trap? Once I connect the PVC drain to the tailpeice, do I need to sodder in the tailpeice to the trap? Thanks in advance!
    speedball1's Avatar
    speedball1 Posts: 29,301, Reputation: 1939
    Eternal Plumber
     
    #2

    Dec 31, 2004, 01:04 PM
    New tub drain
    You're going to have to be more specific and we're going to have to come together on terms before I can even understand your problem. First the terms.
    pop-up tub waste and over flow = a lever on a face plate that mounts on the front of the tub under the spout and also has a pipe in back that extends down to a tee that seats the stopper.
    Tub shoe= The drain itself that fastens to the bottom of the tub and connects to the branch, (middle part) of the tee on the waste and overflow.
    Tailpiece= the pipe that extends out the botton of the tee and connects in to the trap.

    The tub is set first and the rest connected after it's set. If you've never set a tub before there are adjustments, both to the pop-up stopper and the tub shoe connection, that I can't explain without being there.
    As for the trap, Look and see if there isn't a compression fitting on top. The tailpiece didn't just "sit" in the trap or you would have had water all over. And you can't solder PVC to copper. Setting and connecting up a tub is major surgery and I would do all the "scutt" work and purchase all the materials and then call in outside help to complete the job. Happy New Year, Tom

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Slow Bathroom Sink Drain - but Tub and Toilet Drain Fine [ 4 Answers ]

I am hoping that someone can offer a suggestion to solve my problem. We recently purchased a 60 year old home. The sink in one of our bathrooms drains completely fine until the water has run for about 5 minutes and then all of a sudden it starts to back up and then drains very slowly. I have...

Replace toilet drain with washing machine drain [ 1 Answers ]

I need to know how I would go about taking a toilet drain and turning it into a drain for a washing machine.

Covert washer drain to tub drain? [ 3 Answers ]

My downstairs bathroom used to also be the laundry room, but I have relocated the laundry room. I am looking at adding either a tub or a shower unit to the bathroom. Can I covert the old washer drain into a tub drain? I am trying to avoid digging up concrete.

New sink drain 2" off from existing drain [ 4 Answers ]

Sorry for the dumb novice question, but thanks in advance for the advice. My new lavatory sink's drain is 2" away from lining up with the existing p- trap drain pipe. I REALLY don't want to cut off the whole p-trap drain to install a new one that would fit where I need it (as someone has...

Converting cast iron floor drain to shower drain [ 3 Answers ]

I am adding a bathroom to my basement, which has partial (complete? ) plumbing already roughed into the floor (in 1976). Sewage lift station (vented) is 3 ft from 4" styrofoam plug (toilet), 4 ft from 1 1/2 inch cast male pipe end extending through floor (lav, have already added vertical vent...


View more questions Search