I need to replace an old cast iron drain line. The house has a finished basement with concrete floor, partiton walls used for rooms and closets. Digging up the existing drain line to run the new line along the same route would involve a lot of work a demolition.
I would like to re-route the new line in ABS and run it through walls.
This would involve more turns than the existing line has.
It looks like the existing line has one turn at the bottom of the stack as it goes to horizontal.
For simplicity sake, lets call the bottom of the stack point A, and the point where the line exits the house point B.
I would be adding approximetly 5 more turns on the new line to get from point A to point B.
Can I do this so long as I keep the correct drop?
Jesse M
[email protected]