    Shower pan
    I posted this question in the "interior home improvement" category but I have not yet received a reply. Perhaps I posted incorrectly.

    I am constructing a new shower stall in my basement. With respect to the construction of the shower pan, what is the proper method when building it on an existing concrete floor. Can I get away with only putting down one layer of concrete that will be sloped to the drain (with the proper shower pan liner) over top or do I need the base layer of concrete, the liner and then a final layer of concrete that is sloped to the drain? Does the concrete basement floor eliminate the need of basically two layers of concrete? Thank-you for your time and suggestions.
    speedball1's Avatar
    speedball1 Posts: 29,301, Reputation: 1939
    Eternal Plumber
     
    #2

    Oct 25, 2008, 05:45 AM
    You came to the right ploace. Here's a link that will give you instructions complete with pictures, How to Build a Shower Pan
    If you have more questions on down the line fell free to click oin bback to the Plumbing Page. Good luck, Tom
    shahnster711's Avatar
    shahnster711 Posts: 7, Reputation: 1
    New Member
     
    #3

    Oct 25, 2008, 06:01 AM

    Thank-you very much for the quick response and site direction. Do you know if having a concrete floor negates the need for two layers of concrete. Am I able to install one layer of sloped concrete with the liner with a scratch coat over the liner with tiles? The need for putting down two layers on top of a concrete floor (basement) seems like overkill. I'm not sure. Thank you again!
    Milo Dolezal's Avatar
    Milo Dolezal Posts: 7,192, Reputation: 523
    Plumbing Expert
     
    #4

    Oct 25, 2008, 06:09 AM

    I am glad you are planning on water-proofing your shower pan. It tells me you want to do things once and correctly. Lot of people don't. It is definitely a big mistake. Yes, tile and grout itself will prevent direct water from penetrating the base. But it is the Condensation that is produced every time you turn hot water on, that will produce wetness (leak) around shower base area. That's why we water proof shower pans.

    No, existing concrete slab will act only as the solid base to build on...

    You have 2 ways to proceed:

    ONE: PVC LINER SHOWER PAN
    1. Build 4 1/2" curb at the entrance to the shower
    2. Install proper shower drain. Drain must have 3 holes to allow drainage of condensation aka "weep holes". I recommend Cast Iron Instant Set shower drain.
    3. Mix bucket of Mortar Mix. Mix it very dry.
    4. Apply this mix around the outer edge, on the outside perimeter of the shower pan edge, about 3/4" high. Use trowel to spread it towards the drain, creating gentle slope.
    5. Get large piece of PVC liner
    6. Remove upper part of the drain and put it aside.
    7. Lay liner over the entire area of new shower pan and overlap 12" high onto each wall and over the curb. Push plastic over 3 bolts that protrude from bottom part of your drain. Now, your drain will be completely covered. Don't cut in corners unless you are very familiar with installation. Nicely, and tightly, fold excess PVC in corners and staple to the wall. Same over the curb. If you are experienced in PVC liner installation, you can make cuts. In this case they sell inside / outside corner patches that will install and glue over the cuts. Important: even it is called PVC liner, it takes different glue than the one you would use for PVC pipe. Use ONLY glue that is specifically designed for PVC liners.
    8. Put bead of black mastic (like Henry 208) around the bottom part of the drain and around its perimeter. Be generous
    9. Reinstall upper part of the drain over the mastic, squeezing it out
    10. Install concrete over the plastic. Concrete must slope towards the drain at minimal slope. This layer of concrete is a base for tile
    11. Install tile
    12. Seal the grout, tile
    13. Open up drain cover and cut out PVC liner that is covering the drain. Have needle nose pliers ready to grab the cut piece so it doesn't fall inside the drain.

    TWO: HOT MOP INSTALLATION
    It is basically same procedure except that Hot Asphalt will take place of PVC liner. Hot Moping is usually done by worker specializing in this type of work.
    When installing hot mop, they will first install layer of #40 paper over existing floor, than hot mop it. Hot Moper will then install dry mixture of concrete creating slope towards the drain. Then again, they install another layer of #40 paper with hot asphalt over it.

    Two layers of concrete are necessary. The first (slab) is your starting base, the second layer is sloped toward the drain to lead condensation to the drain.

    Depending where you live, opinions about PVC and / or Hot Mop pans vary. Hot moping is an old, well proven method while PVC liner is relatively recent upgrade. Regardless, both methods are approved by Code and both methods work.
    speedball1's Avatar
    speedball1 Posts: 29,301, Reputation: 1939
    Eternal Plumber
     
    #5

    Oct 25, 2008, 06:24 AM
    Quote Originally Posted by shahnster711 View Post
    Thank-you very much for the quick response and site direction. Do you know if having a concrete floor negates the need for two layers of concrete. Am I able to install one layer of sloped concrete with the liner with a scratch coat over the liner with tiles? The need for putting down two layers on top of a concrete floor (basement) seems like overkill. I'm not sure. Thank you again!
    Great post by Milo, Here's another link for you to study. You .Mortar Bed Shower Floor for Tile Showers We first put down a flange type shower drain,(see image) followed by the membrane, (shower pan) From there on in the tile guys comke in and complete the job. Good luck, Tom
    shahnster711's Avatar
    shahnster711 Posts: 7, Reputation: 1
    New Member
     
    #6

    Oct 25, 2008, 06:31 AM
    Quote Originally Posted by Milo Dolezal View Post
    I am glad you are planning on water-proofing your shower pan. It tells me you want to do things once and correctly. Lot of people don't. It is definitely a big mistake. Yes, tile and grout itself will prevent direct water from penetrating the base. But it is the Condensation that is produced every time you turn hot water on, that will produce wetness (leak) around shower base area. That's why we water proof shower pans.

    No, existing concrete slab will act only as the solid base to build on....

    You have 2 ways to proceed:

    ONE: PVC LINER SHOWER PAN
    1. Build 4 1/2" curb at the entrance to the shower
    2. Install proper shower drain. Drain must have 3 holes to allow drainage of condensation aka "weep holes". I recommend Cast Iron Instant Set shower drain.
    3. Mix bucket of Mortar Mix. Mix it very dry.
    4. Apply this mix around the outer edge, on the outside perimeter of the shower pan edge, about 3/4" high. Use trowel to spread it towards the drain, creating gentle slope.
    5. Get on large piece of PVC liner
    6. Remove upper part of the drain and put it aside.
    7. Lay liner over the entire area of new shower pan and overlap 12" hight onto each wall and over the curb. Don't cut in corners unless you are very familiar with installation. Nicely, and tightly, fold excess PVC in corners and staple to the wall. Same over the curb. If you are experienced in PVC liner installation, you can make cuts. In this case they sell inside / outside corner patches that will glue over cuts. Important: even it is called PVC liner, it takes different glue than the once you would use for PVC pipe. Use ONLY glue that is specifically designed for PVC liners.
    8. Put bead of black mastic (like Henry 208) around the bottom part of the drain and around its perimeter. Be generous
    9. Reinstall upper part of the drain over the mastic, squeezing it out
    10. Install concrete over the plastic. Concrete must slope towards the drain at minimal slope.
    11. Install tile
    12. Seal the grout, tile
    13. Open up drain cover and cut out PVC liner that is covering the drain. Have needle nose pliers ready to grab the cut piece so it doesn't fall inside the drain.

    TWO: HOT MOP INSTALLATION
    It is basically same procedure except that Hot Asphalt will take place of PVC liner. Hot Moping is usually done by worker specializing in this type of work.
    When installing hot mop, they will first install layer of #40 paper over existing floor, than hot mop it. Hot Moper will then install dry mixture of concrete creating slope towards the drain. Then again, they install another layer of #40 paper with hot asphalt over it.

    Two layers of concrete are necessary. The first (slab) is your starting base, the second layer is sloped toward the drain to lead condensation to the drain.

    Depending where you live, opinions about PVC and / or Hot Mop pans vary. Hot moping is an old, well proven method while PVC liner is relatively recent upgrade. Regardless, both methods are approved by Code and both methods work.
    Milo,

    Thank-you very much for taking the time to submit such a detailed response. I really appreciate it. Steve

    Quote Originally Posted by speedball1 View Post
    Great post by Milo, Here's another link for you to study. you .Mortar Bed Shower Floor for Tile Showers We first put down a flange type shower drain,(see image) followed by the membrane, (shower pan) From there on in the tile guys comke in and complete the job. Good luck, Tom
    Tom,

    Once again, thank-you very much! Steve
    Milo Dolezal's Avatar
    Milo Dolezal Posts: 7,192, Reputation: 523
    Plumbing Expert
     
    #7

    Oct 25, 2008, 06:46 AM
    Quote Originally Posted by shahnster711 View Post
    Tom,

    Once again, thank-you very much! Steve
    Good luck with your project ! Come back to us with progress report !
    speedball1's Avatar
    speedball1 Posts: 29,301, Reputation: 1939
    Eternal Plumber
     
    #8

    Oct 25, 2008, 07:26 AM
    One more link you may find useful. This instructs you on how to make the folds,(corners) in the shower pab, http://toolbelt.buildiq.com/tool-doc...owerPanSBS.pdf
    Good luck, Tom

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Correct pvc shower drain for sterling #62040100 60" seated shower receptor [ 6 Answers ]

Has anyone installed a sterling 60" seated shower receptor with wall surrounds on a concrete slab. The new unit did not come with a shower drain. there is a hole in the bottom That is 3-5/16" (8.4cm) and it calls for a drilled hole in slab oor foundation of 4-1/2" (11.4cm). the old drain line...

Build Shower Platform & Install Above Ground P-Trap in Basement Shower [ 1 Answers ]

Hello, I'm new to this site. I tried to find the answer in previous posts and did find some great info, but I still have some questions :) This is what I want to do: Install a corner shower with dimensions 36" in x 36" in the basement, build a platform, & add an above ground p-trap. ...

My shower drain is raised above the shower pan by 3/16" causing standing water [ 2 Answers ]

I have a fiberglass shower stall where the bottom has either slumped or the stall was installed wrong to begin with (it has no support beneath the surface that I stand on). The drain sticks above the level line so I have about 3/16" of standing water. I cannot easily access the bottom from the...

Replace shower Plumbing Valve assembly shower head 2 knobs [ 3 Answers ]

In a fiberglass corner shower shell. What I have is an old leaking rusted Shower valve assembly. It leaks from the Shower head that is a hand sprayer with a wall mount from the sprayer. It also leaks around the both the hot and cold water wall mount knobs. The cold water knob the sleeve that...