Toilet drain questions
We're installing a new bathroom on the third floor of our old house. The toilet is on the wall opposite the 3” stack. The 3” drainpipe from the toilet will run horizontally about 8 feet to where it will pick up the 2” lavatory drain (vented) in a 3x3x2 wye. The 3” drain will then turn and drop about 2 feet and enter the stack in a 3x3x3 wye. I have two questions.
1) The floor joists are truly 7”x2” (an old house). If we install the closet bend so the top is level with the floor, there will be just over 1/8th inch drop per foot for the horizontal portion of the drain. While this slope is apparently marginally acceptable, I would like to know if we could trim the top of the closet bend (and the bottom of the toilet flange) to raise the bottom of the closet bend and, thereby, increase the drain slope. In other words, can we get away with less than the 1.5” overlap for the PVC weld?
2) I believe the 3” drain is properly vented by the above arrangement. However, I could also vent the drain to the wall behind the toilet by inserting a 3x3x2 wye at about a 45 degree angle just after the closet bend, running the 2” pipe for about 18” with an upslope of at least ¼” inch per foot before the vent would turn vertical. This arrangement would allow me to put a cleanout on the vent line from where I could snake out almost all of the 3” line. Is this a good idea?
Thanks in advance for your help.
|
|
 |
Eternal Plumber
|
|
Apr 14, 2006, 06:43 AM
|
|
1) "The floor joists are truly 7”x2” (an old house). If we install the closet bend so the top is level with the floor, there will be just over 1/8th inch drop per foot for the horizontal portion of the drain. While this slope is apparently marginally acceptable, I would like to know if we could trim the top of the closet bend (and the bottom of the toilet flange) to raise the bottom of the closet bend and, thereby, increase the drain slope. In other words, can we get away with less than the 1.5” overlap for the PVC weld?"
While 1/4" to the foot is normal it's not set in stone. !/8th is acceptable if slope's tight. We put in lots of new installations at 1/8th to the foot. In case you're wondering, 1/8th is just cracking the bubble on your level.
2) "I believe the 3” drain is properly vented by the above arrangement. However, I could also vent the drain to the wall behind the toilet by inserting a 3x3x2 wye at about a 45 degree angle just after the closet bend, running the 2” pipe for about 18” with an upslope of at least ¼” inch per foot before the vent would turn vertical. This arrangement would allow me to put a cleanout on the vent line from where I could snake out almost all of the 3” line. Is this a good idea?"
Cleanouts are always a good idea. Especially if the homeowner is a do-it-yourselfer. Your toilet will be vented by the lavatory in any case. I don't see a tub or shower. Is all you're planning a 1/2 bath? Regards, Tom
|
|
 |
Full Member
|
|
Apr 14, 2006, 07:23 AM
|
|
Tom - Thank you for your help.
The shower drain will run in a parallel joist space, turn down in a long sweep, and join the toilet line in a 3x3x2 wye immediately before the toilet line enters the stack. The shower will be vented to the opposite wall in a similar way as I proposed for the toilet, allowing a cleanout for the shower line as well.
|
|
 |
Eternal Plumber
|
|
Apr 14, 2006, 07:27 AM
|
|
 Originally Posted by dclynch
Tom - Thank you for your help.
The shower drain will run in a parallel joist space, turn down in a long sweep, and join the toilet line in a 3x3x2 wye immediately before the toilet line enters the stack. The shower will be vented to the opposite wall in a similar way as I proposed for the toilet, allowing a cleanout for the shower line as well.
Sounds good to me. Cheers Tom
|
|
Question Tools |
Search this Question |
|
|
Add your answer here.
Check out some similar questions!
Slow Bathroom Sink Drain - but Tub and Toilet Drain Fine
[ 4 Answers ]
I am hoping that someone can offer a suggestion to solve my problem. We recently purchased a 60 year old home. The sink in one of our bathrooms drains completely fine until the water has run for about 5 minutes and then all of a sudden it starts to back up and then drains very slowly. I have...
Using shower drain for washer - questions
[ 3 Answers ]
Thanks in advance for any help on my following questions. I am moving our washer/dryer to an existing bathroom. I plan on using what was a shower drain for the washer. We are on a slab and I believe the shower drain is vented already. I plan on installing a check valve to prevent back flow. I...
Toilet drain
[ 1 Answers ]
We are building a new home and the drain plumbing for a toilet upstairs has a 90 degree elbow directly out of the clamp for the toilet, goes about 6 inches, another 90 degree elbow down into the trap. They could have went straight down into the trap, it appears, but put the extra piping in. I...
Toilet drain
[ 3 Answers ]
We want to make our existing attached garage into a bedroom and a bathroom. The bathroom would be right next to the laudry room. Our house was built in 1960. It is on a slab (no crawl space) with all of the plumbing & heating built into the slab. We have talked to several people about if the toilet...
New shower/tub drain questions
[ 3 Answers ]
I have received a permit to move my existing whirlpool to a new location and install a shower in the old whirlpool location. I have 3 questions:
1. I will be cutting into an existing 3" PVC drain and adding a 3x2x3 wye. From the wye I will have a short run of 2" pipe and then another wye...
View more questions
Search
|