I have a Main load center that is configured like a sub panel. By this I mean that neutral is isolated. At the SE after the Meter there is a service disconnect then an aerial drop to the Main load center. I want to run a 60amp sub panel off this panel. Is this OK? Can I be connected like a normal sub panel?