If it takes 2 days for 4 men to dig a hole 1 metre wide by 2 metres long and 1 metre deep, how long will it take 2 men to dig a hole 2 metres wide, 3 metres long and 1.5 metres deep?
![]() |
If it takes 2 days for 4 men to dig a hole 1 metre wide by 2 metres long and 1 metre deep, how long will it take 2 men to dig a hole 2 metres wide, 3 metres long and 1.5 metres deep?
All times are GMT -7. The time now is 01:21 PM. |