... a little late but it looks correct in principle except the slope (1/4"/1') seems a little large? Optical thing or is it really falling off rapidly? Is that a cleanout next to it?Quote:
Originally Posted by PTflyer
... a little late but it looks correct in principle except the slope (1/4"/1') seems a little large? Optical thing or is it really falling off rapidly? Is that a cleanout next to it?Quote:
Originally Posted by PTflyer
Quote:
Originally Posted by Flickit
Are you talking about what is next to the PVC line in this picture?
If it is,that is the closet flange with a rag stuck in it... not a clean out... and the fernco is tied into the vent... is that correct...
------------------------------------------------------
Also I do have the pvc with about a 1/4" per foot pitch... too much?. as I can adjust it... I just figured a little more pitch wouldn't hurt but if it does I can change it easy enough... until I cement it in...
I'll await a reply before I do any mixing...
Dead-on (1/4"/1'). Looks good to me...Quote:
Originally Posted by PTflyer
Excellent... thanks so much for all your help... you guys are the best!.
I feel so much better now covering it up and moving on with this job... I will be sure to post a few pictures once I get the bathroom all finished...
Off to go mix some cement now...
Sorry for the delay. My hard drive fried and I'm just getting back on line.Quote:
Originally Posted by PTflyer
The shower drain looks to be a little long from the trap to the vent but, overall, it looks good to me. Good luck, Tom
All times are GMT -7. The time now is 05:05 AM. |