Why am I having Testing BLOWOUTS
I am getting the waste stacks ready for inspection on a new build 4 story apt complex with about 100 units. I am only testing one side with about 28 apts at this time and I have the stacks separated with Y's and weenies in the basement, but unfortunately there is no way to separate the floors. There is so much pressure by the time I get the water near the roof I end up blowing apart pipes at the cupplers on the 4 inch lines in the basement. Any tips would be greatly appreciated.