Another sewage ejector venting issue
I'm installing a qwik-jon sewage ejector in the basement. The 2" discharge liine will tie into existing 4" drain after about a 2 foot lift. My problem...
The only existing vent line I can access is the 1 1/2" vent from the washing machine drain. Is it possible to tie in the 3" vent line from the qwik-jon to this vent, or do I need to run a new vent line? This won't be easy... the existing lines are all behind finished plaster/lath walls. I could possibly cut it out through the foundation at ground level and run it up the outside of the house. What would you recommend?
hackplumber