Ive recently did a breakout of basement slab to put in a shower drain. I have tapped into the main line to the street. The 45 degree elbow from the main line to p-trap sticks up above the filled in sand/dirt mixture (or in essence where I am to put concrete) Is this OK? I don't want to concrete the top of that pipe, correct?