How to run a 3"drain pipe
The relocation of my upstairs bathroom requires the change of the 3" abs drain pipe. The pipe starts at the toilet, after approx. 3 feet of horizontal run a 2" shower drain is connected with a Y-piece. Then after another 2 feet is a 1 1/2" sink drain connected with another Y pice. After 1 foot of horizontal run I want to put a 90 elbow pointing downwards. Right after this I want to put another 90 elbow going to the left side. Then there is a 5 feet horizontal run before it finally connects to the drain stack that disappears in the basement floor. Is this going to work or will I get problems at the two 90 turns? Instead of using the two 90 turns I could also use 45's. But there is still the 5 feet run before it connects to the 3" main stack. Any help woould be appreciated.