Need a little help please. I just ripped out my old shower and I'm about to build a new shower pan. I hammer drilled up the concrete around the old drain. There is 2" drain pipe about about 5" tall which is sleeved into another larger iron pipe with a big flange on it, ( the p trap I presume). This existing 5" tall pipe is to tall when I set my new Oatey Drain on top. I thought about cutting down the 5" tall pipe but it will require taking out much more concrete to get a saw in there. I was thinking about replacing this piece of iron pipe with a shorter piece of PVC. How would I connect the PVC to the iron in this situation. I can't use one of those rubber couplers. Any ideas?
