I need to install a 480v 3 phase panel 350' from the power source. I plan on running 2" emt to a main disconnect at the other end and setting a 480v delta to a 208 wye transformer and then setting a sub panel for 208/120v power. My calculations give me 3/0 cu or 4/0 al with a1.81% vd. Can you verify my calculations?