NEC code specifies that my 200amp main will only be allowed to handle a 40amp backfeed from a PV solar array. I need more than 40amps. I want to upgrade my main panel to 400amp and derate the main breaker to 200amps. Is this an acceptable approach? Are all 400amp panels 3phase. I believe my current service is 2phase, this is residential.