I have a ledged wall in a below grade room. I need to replace the below grade due to water damage. Once I complete the removal and clean up I would like to restud the wall floor to ceiling and subsequently remove the ledge. Can I stud from the existing ledge up, leave the upper drywall as it exists, insulate the new stud wall and drywall anew? My concern is having an upper wall consisting of insulation/drywall/insulation/drywall – will this create a vapor flow problem?