Originally Posted by speede5
I busted up the floor in our basement to put in a bathroom. I was going to tie into the main drain line about 5 feet from the stack and replace the base of the stack. i also wanted to change the existing floor drain which ties in 5 feet further down the line. I busted it all out and the main drain line (cast) had 5 small (1/4) holes in it. i was pretty sure I did this with the jackhammer but i could fit my pinkie in one and it felt thin. my question is how far should i go with this. i have 10 more feet to get to the front cleanout, but it is on the other side of the wall in a different room and will be a disasterous mess. Do I keep tearing up the floor or stop now and replace what is exposed? If the rest of the pipe is kinda thin will i regret not changing it in 5-10 years?