Half Bath Too Far From Main Stack
My father-in-law and I are putting in a half bath on the main floor. The problem is, the location is too far from the main stack, about 15 feet or more. The idea we came up with (see image) is to tie into the sewer line (1) close to where it comes in from the outside. We would have to break into the concrete floor of the basement and tie in as close to the wall as possible. Our new stack (2) would go up into the wall of the main floor where the bathroom will be. It would loop inside the wall and come back down just under the floor. It would then run along the basement ceiling and vent in to the original main stack. The toilet (3) and sink (4) would tie in as shown.
My question is: will this work? If not, can you give me any ideas to make it work?
Thanks in advance...