I removed the old tub and exposed the drain pipe. Where the drain pipe comes through the slap there is a 8x8 hole to allow the tub drain pipes to fit.
I'm going to install new drain pipes for the tile shower which consist of a 90 coming out of the main drain pipe then 6" to another 90 that will attach to the shower drain. When this is complete can I or should I fill the hole in the slab with cement so that the shower floor will be solid? The drain pipes will not be accessible after doing this.
I was then going to cut a piece of cement board to lay on top of the shower floor to make it flat before putting down my membrain.
Does all of this sound correct? What do you think about filling the drain pipe hole with cement?
Thanks for your help