Hello, our house water line, which is a 1" copper pipe 1' deep in the front yard, runs right above the sewer cleanout, which is a vertical C.I.P. The cleanout plug, which is 1' below the water line, has to be brought to grade, that is, all the way to the surface.
Would it be acceptable to redirect the copper line around the cleanout by soldering four 90° elbows and extra pipe pieces? Let's say, cut out two ft. of the old pipe and solder in a 2' × 2' loop?
Would appreciate any comment. Best wishes, h.