Hello! Looking for a response from whomever is familiar with plumbing contracting. A sink hole at the edge of the front yard suggests that the old clay lateral sewer line, the one between the house and the city main, has to be replaced with C.I.P. and, in addition, a Y-connection and clean-out have to be installed.
How long does it take to do the job: digging, installation, etc. That is, how many hours should I be charged for by a contractor? The lateral line is about 5 ft. deep, 20 ft. long. Thanks, h.

