Simple question I hope:
How long should my leads be inside the boxes? I'm guessing about 6"?
Also, for the electric rough-in inspection; do I just leave the wires sheathed inside the boxes, or should I connect all the grounds (bare copper, and whites) and just leave the hot wires (unpowered) dangling?
Thanks to all
Mike

