Constructing a 40X60 pole building (with 16 foot interior ceiling) in Erie County Pa. I am told that after augering a 14 inch hole , pole needs to be on a 6 inch high pad at bottom of hole. Fill in rest of hole around 6X6 (to ground level) with what?? Mixed concrete? Gravel? Dirt? Dry Sakrete powder?
