Had a few questions with regards to installing tile for a new shower I am installing, since I am finishing my basement. The basement was already plumbed for a bathroom, but it was plumbed for a tub, I am installing a shower, so I used a fiberglass pan, 34x60, already installed.
I was going to use Schluter-Kerdi Backer board on the walls for the tile.
My questions are as follows:
1. How far past the edge of the shower pan should the tiles go, is there usually a minimum? (I was thinking about 3-6 inches past the shower base)
2. Do I need to place a stud at the location of where the Kerdi board ends, and drywall starts, so the ends are nailed/screwed into a stud?
3. Do I tile right up to the joint of the kerdi board/drywall, or do my edge tiles actually end up covering that joint, so a portion of the edge tiles end up being installed on the drywall?
4. When installing the kerdi board, should it go over the shower flange, and leave about 1/4" above the lip and caulk that, or do I stop it short of the flange, and caulk the gap between the board and flange?