Retaining Wall at Entrance to Laneway...
6 years ago I had widened our laneway... Turning into our laneway there is a Ditch as you enter... At the time it was a simple job as there was about 8ft. Of culvert pipe sticking out the oneside... The Ditch is your standard sloped type.. I used 6" X 6" timbers, by the way there a true 6 inches... Sledge Hammered spikes into them and used steel fence posts on the outside edge.. From the centre top of the culvert pipe to the top of the Retaining Wall it's 4 1/2 ft. high. And stretches 14 ft on top... Now the Neddy Grits.. While the steel fence posts are doing their job the timbers are starting to show signs of drying out after being water logged and starting to split along the top.. The plan is by using the existing wall as a form on one side and digging a trench to build a form for the other side. The idea is to pour a concrete wall... How wide would it have to be and any idea how much concrete I'd need for the Job?? Thanks