Permanently remove of the Pipeline Insulatation
Iam working at central crude oil production facility. We export oil to company terminal. In Terminal we have Meters & Meter prover are insulated. Under insulation corrosion occurred in the Meters & Meter prover.
Could you please advise if we can permanently remove of the Insulators at the Meters & Meter prover pipeline.
The oil temperature is 85 - 100 0F
Pour Point: -15 to +6
Spec. fravity 0.87
Ambient temperature: 77 - 113 0F (25 - 45 ° C) in summer
59 0F (15 0C) - 80.6 0F (27 0C)
Humidity: 45 - 86%
Nabil