I need help with a tub a plumber installed in my basement. He jack hammered the concrete and the drain lines are installed. He put concrete over most of the floor except where the two lines come up to the tub. When I asked why it was left open he said because the floor needs "to stay open because it will make it easier to clean it out." Is this correct because it looks incorrect to leave the earth exposed to the home. Help... please.