What needs to be stubed out from the concrete slab? Help?
I am installing a small 600 + SF hunting / fishing cabin on property that I own. The location already has a septic in place, I am pouring a concrete pad on which a small cabin 14x44 will be placed. The cabin is prefabricated and will be delivered and placed on the slab. It has 2x6 floor joists that will be set on top of 4x4 runners down the length of the cabin. This means there will be approximately nine inches from the top of the finished slab to the bottom of the sub floor. I would like to eventually install some plumbing including a toilet, shower, sink, kitchen sink and laundry drain for a W/D combo. Attached is diagram of the plumbing locations and the slab. Can someone tell me what needs to be placed in the concrete prior to a pour. It will be for the future use of the fixtures mentioned.