Full bathroom venting for finished basement.
I had my basement plumbed for a full bath during construction. So, I have a 2" pvc lav pipe coming out of concrete, next in line is the toilet pipe sticking out, then the shower/tub drain, it runs to the main under the slab. I have a 2" pvc vent that is capped and in between joists above and I know it runs straight up and through roof. So, I want to verify that I can tie the lav's trap into that vent line and that would vent all three fixtures/traps (dry, wet, and wet). Is that correct?
Thanks in advance!