The contractor building my house has arranged all the rebar in the load-bearing columns and beams very close to the surface of the concrete. I've read elsewhere there should be a MINIMUM of 3/4" coverage (1 1/2" recommended). In most places coverage meets that minimum (just barely), but there are several locations where coverage measures only 1/2". Should I be concerned?