Tie into Existing 4" sewer line
Hello,
I am going to be installing a new sewage ejector pump, and will tie into the main house 4" sewer line with a 4x4x2 Y connection. My question is, what is the best way to connect that. I know how to tie into it, but is it easy? It seems like the 4" line will not have too much give in it, and be tough to get the Y to fit. The location where I am tying in, there is another Y fitting like 5 feet up flow of this connection, so there is not much movement there, but downflow of the connection, the only thing restraining it is the "J" hooks to support it. A contractor came in and looked at it, and mentioned the possibility of cutting a larger section out than needed, installing the Y, installing a slip coupler, and then install the rest of the pvc as needed, and join that with the slip coupler.
Attached below is a photo of where the line is located. I will be coming from the top, between the joists, and dropping down on top of the 4" main line.
Any suggestions, is it easy to tie into a 4" line with a Y coupler due to the size and stiffness of the pipe?
Thanks,
Steve