I have a relatively new bungalow with an unfinished basement. The basement is roughed in for a bathroom (sink, toilet & shower/bathtub) however I do not see a vent line.
My question is can I use a common AVV off the sink drain line for all three or is one required for each. If one is required for each I will have break the cement for the toilet and the shower.