I am extending my shed and adding an outside Bathroom, with a toilet, shower and basin. The flooe will be poured concrete. My questions are
1. Do I need to cover the Pipe before I pour the concrete
2. What drop / sloop needs to be in the waste pipe
3. How far should the waste pipes be below the concrete slab?