Ejector pit installation in concrete floor
Hi,
I am planning on installing a full bathroom in a basement. There are no drain lines in the floor and no exiting ejector pit to tie into. There is a main drain going out to the septic that I can use for venting. So, I'm guessing I'll be cutting the floor running the drains and digging a hole for the ejector pit, plus supplying power to it and its drain and vent lines. I was hoping to get some info on the details of the job, what to look out for and tips since this in the first time I have had to dig into a concrete floor, the house was built in the late 70's.
Thanks a lot