We are having a toilet relocated to the other side of the bathroom. There will be a 6 foot run of waste pipe under the floor, that will connect to the stack that currently exists. The new toilet we are buying is a 1.28 GPF low-flow toilet.
My question…will 1.28 GPF be enough water to remove the waste along the 6 foot pipe, or will it sit in the pipe. Are we asking for trouble with this configuration?
