1 Attachment(s)
New bath on slab (tie into existing lines)
I plan on adding another bath into an apartment I have attached to a hangar building. It has an existing septic system with a kitchen / bath and laundry on it now.
I want to add a shower, toilet and lav to the new bath.
This needs to function well, but there is no permit or inspection worries
I made some drawings in hopes they would help.
1. Should I run 3" into the new area, then Y it off and have the shower continue on 2" and feed the toilet on the y'd off 3 inch?
2. Where should the Lav tie into? The toilet run, or Y'd off the shower run?
3. Can I vent back to the main vent by going overhead? (It would be about 10.5 feet from the lav wall to the current vent) It has a metal roof and I'm trying to avoid another penetration.
4. Do I P trap it under the shower?
I'm also converting the bathtub in the existing bathroom to a samller shower. I know I can get a 2" offset drain, but would rather just move the drain closer to the center.
5. Would I assume that the bathtub had a P trap and just run my moved pipe to the center, or do I need to add a P?