Quote:
I have done a Demand load calc, and it revealed 120 amp calculated. I know the main is pretty full. Is there a way to have the power company or an electrician (not sure who would be responsible for doing this) run power between the meter and the house to another panel or some sort of 120 amp circuit breaker box that supplies a 120amp sub panel? If so, with 120amp computed load, what size breaker (between the metter and the feeder cable), What size sub panel, and wire between the two would you use. Also I am assuming that I will be using 4 conductor cable (2-hot, 1 neutral, and one ground).