I'm puttin in a toilet for a friend,who doesn't want to cut into her concrete floor but would rather put in a sub or raised floor instead.I was going to use 6" boards to raise the floor higher then tie into the main and I was wondering if I could use 3" pipe because I only have 2" of the main that is above the concrete floor to use as a nipple to put a 3" y connection in for the toilet to drain into.or do I need to raise the floor even higher/