Running Electrical Run Through Load Bearing Wall?
I'm running flexible electrical metal conduit throughout my garage (2 stories) and I have an 8 foot section of wall where it is double shear and load bearing (rated plywood on both the outside and inside faces of the 2x6 and 4x6 studs). Is it OK and/or standard practice to remove the plywood on one side and drill 3/4" holes (for 3/4" metal conduit) horizontally through the studs in this section of wall for my electrical? Of course I will replace the plywood as it was removed.
Thanks,
Royce M