I am in the process of removing and replacing a brick patio that was 1-poorly done (many gaps) and 2-in disrepair.
I have done some research and asked a round and have heard differing depths to lay the crushed gravel and layer of sand, anywhere from 4 to 8 inches.
Quite frankly this old lady is sick of digging and moving dirt.
If I am going to do it properly what would be the proper depth in order to insure a stable patio?
Also, I should have a 2 inch layer of sand underneath the brick and the rest should be crushed gravel underneath that? Is this correct?
Thanks in advance.