    ABC Costing Problem
    The new president of the Wernecke Company was stumped. Why had profits gone down? He had directed the sales department to push the product with the highest contribution margin, and the sales department had come through with flying colors. The percent of flams sold had increased from 25% of units sold to 37.5% of units sold. So what happened?

    Flims Flams
    Sales Price per Unit $150 $500
    Direct Materials per Unit $75 $200
    Direct Labor Cost per Hour $25 $25
    Direct Labor Hours per Unit 1 hour per unit 5 hours per unit
    Number of Units Produced 25,000 15,000

    The variable overhead for the coming year is estimated to be $3,000,000.

    Required:
    1. Calculate the Wernecke Company’s estimated direct labor hours to produce flims and flams.

    2. Calculate the predetermined variable overhead rate that will be used in the coming year using a traditional costing system based upon direct labor hours.

    3. Using a traditional costing system based upon direct labor hours, compute the unit product costs for flims and flams as well as contribution margin per unit.

    4. It has been suggested to the president to consider the use of an ABC costing system to allocate manufacturing overhead. Engineering studies have revealed the following information about estimated manufacturing activities for the coming year.
    Activity Cost Pool Estimated Overhead Cost Expected Activity Level
    Setups $850,000 200 setups
    Scrap $350,000 500 units
    Testing $200,000 5,000 tests
    Machine related $1,600,000 100,000 Mhrs
    Total $3,000,000
    Calculate the separate predetermined overhead rates for each of the activities listed above.

    5. The following data is available about the activity levels needed to produce the projected 25,000 units of Flims:

    Activity Cost Pool Estimated Activity Level for Flims
    Setups 50 setups
    Scrap 200 units
    Testing 2,000 tests
    Machine related 12,500 Mhrs.
    Calculate the expected variable overhead to be applied to Flims.

    6. The following data is available about the activity levels needed to produce the projected 15,000 units of Flams:

    Activity Cost Pool Estimated Activity Level for Gadgets
    Setups 150 setups
    Scrap 300 units
    Testing 3,000 tests
    Machine related 87,500 Mhrs.
    Calculate the expected variable overhead to be applied to Flams.

    7. Calculate the total overhead (total for company) that is expected to be applied to Flims and Flams.

    8. Calculate the projected unit costs and unit contribution margins for Flims and Flams using ABC costing.

    9. What conclusions can you drawn about the use of traditional costing vs. ABC costing for the Wernecke Company? What recommendations do you have for the president?
  • May 2, 2012, 06:11 AM
    Curlyben
    Please refer to this announcement
    Quote:

    Do not simply retype or paste a question from your book or study material

    We won't do your homework questions for you.
    You were given the assignment for you to learn.

    If you come up with your own answer and post it for us to critique that is within reason.

    If you have some SPECIFIC questions that you couldn't find or didn't understand, we may help with that.
    But this is your assignment, so show us you have at least attempted to complete it on your own..
  • May 2, 2012, 06:47 AM
    pready
    Number 1 is very simple. Just take the number of direct labor hours required to produce a particular unit times the total number of a particular units produced.

    Now you try to solve your problem.