2 Sheets of Drywall in the bathroom on Metal studs
I have a prefab shower and tub in my bathroom. I am going to pull the it out and install a new tub and tile up the walls. I want to do it right by removing the drywall under the prefab, install cement board before installing the tile.
My problem is that the building was made with metal studs and on one wall one there is double dry wall (on the long wall). My unit is adjacent to another condo unit so the wall between has two layers of drywall.
The questions I have are:
- Do I need to put up a moisture barrier (plastic) on the walls prior to putting up the cement board?
- How do I handle the double layered wall? Remove both drywall layers and install double cement board? Remove on layer and install the cement board?
- With metal studs what is the best way to put up the cement board? Do I install it same as wood studs?