I had a plan from architect and engineer. Suspended 28x30 slab. 3 wait 58 beams 30' long. Metal pan and 6" wire mesh. Concrete 7" in back 5" in front. Beams deflected ( under an inch). I was nervous called architect. He says 44wwf was speced and I didn't do it right Is it OK? He sent me another bill!