Has anyone ever heard of screwing down through the floor of a copper pan to hold it in place while they solder the drain in place? I saw a plumber doing this recently and thought it was crazy but he told me this is the correct way to do it. I would have thought that putting 4 holes in the base of a pan to hold it in place was a major no no. Does anyone know if type of installation is normal or not?
Thanks