Ask Me Help Desk

Ask Me Help Desk (https://www.askmehelpdesk.com/forum.php)
-   Industrial Engineering (https://www.askmehelpdesk.com/forumdisplay.php?f=498)
-   -   Probability (https://www.askmehelpdesk.com/showthread.php?t=638546)

  • Feb 23, 2012, 07:59 PM
    hicheong
    Probability
    Suppose X is a continuous random variable denoting a specific measurement from a manufactured product (e.g. a volume). The quality loss from the manufacturing process leading to this product is
    defined as the expected value of c(X − m)^2 , where c is a conversion constant from the deviation in the desired value for X to monetary loss for the producers.

    ( i.) Suppose E(X ) = m and V (X ) = σ^2 . Determine the quality loss for this process.

    (ii.) Suppose E(X ) = µ and V (X ) = σ^2 . Again, determine the quality loss for this process.

    I have no idea how to start this! Please help.

  • All times are GMT -7. The time now is 05:31 PM.