Hello,
I built my house about 3 years ago and I'd like to finish the basement. The bathroom was setup for a shower, sink and toilet. My question is how to install everything. I have 2 pipes coming up from the floor both 3.5"dia capped. I also have a square patch in the floor for the shower drain I believe (The builder said he does this so he can find it) . I assume the middle pipe is for the toilet which I don't think I need to vent. The pipe on the left is for the sink? Why 3.5 inches? Do I need to vent this? Also, I have in the ceiling a 1.5 inch pipe capped I assume for vent.. . Pic 1 Shows the Pipes in the slab from the front, pic 2 from the shower end. The final pic (3) is the ceiling where the vent is. You can see in this pic the sink drains from the bath upstairs next to the vent, and the other end is the toilet.
Thanks for in advance for any help.