My concete floor in my shed is about 6 months old. It was made in two pours of 28'x30', 6 inches deep with wire panels. No control joints were sawn in at the time. Can I still saw them now and will they still work to guide any cracks that may occur. So far no visible cracks but I am in Illinois and have not went through the winter yet.