I'm doing a rough in for a powder room and am at the point of installing the supply lines. I understand the preferred way to do this is with drop eared els and nipples that will eventually connect to the shutoffs.
I see two issues with this method: 1) how can I be sure the threaded connection to the el doesn't leak after the sheetrock is up and, 2) how can I be sure to get the stop aligned vertically when I'm tightening the final connection?
How about just using copper stub outs and soldering a quarter turn ball valve for the shutoff? There is not much resistance when turning these shutoffs and I'd think the copper pipe would hold up well.
Thanks